How we install — the high-level workflow
Every opening gets the same seven-step sequence, whether it’s a single window or a multi-panel patio door. Here’s what happens from the moment we arrive to the final walkthrough.
- Prep & Access — confirm measurements, protect floors, and clear inside and outside access.
- Careful Removal — remove sashes and stops; preserve trim when feasible.
- Inspect & Prep the Opening — check plumb, level, and square; address minor issues.
- Set, Shim & Anchor — align the new unit for smooth operation and proper clearances.
- Insulate & Seal — low-expansion foam or backer rod plus sealant, where appropriate.
- Trim & Finish — reinstall or replace stops and casing with neat caulk tooling.
- Test & Walkthrough — operate every unit, adjust as needed, and review maintenance together.
Project duration & scheduling
- Typical pace: smaller projects can be completed the same day; larger homes are phased. A standard two-person crew may complete multiple windows per day depending on size and access, while large patio doors can add additional time.
- Variables: access, weather, unexpected conditions (for example, hidden rot), and product complexity (for example, multi-panel doors) can extend duration.
- Phasing: we generally finish each opening before moving to the next to keep your home secure and weather-tight.
- Communication: we confirm the plan each morning and do a walk-through at the end of each phase.
Wondering about product lead times before we can start? They vary by manufacturer, product line, and even the shape of the window or door, so we don’t publish fixed ranges — ask us for current timelines on the products you’re considering and we’ll build them into your schedule.
We follow manufacturer recommendations — for example, Pella pocket-replacement and Andersen/Marvin replacement guidance — to protect your product warranty.